DUWASA LEAKAGE MANAGEMENT SYSTEM DASHBOARD

Total Reports

0

Visible as map points and table rows

Fixed Reports

0

Healthy areas marked in green

Temporal Fix

0

Monitoring temporary interventions

Not Fixed

0

Priority points still needing attention

Dodoma Leakage Coverage Map

Full-width Leaflet/OpenStreetMap view for September 2026 records from leakage_reports.

Critical / Not Fixed Temporal Fix Fixed / None

Leakage Reports

Transactions-style table for September 2026 records rendered on the map.

Map Synced

0 priority points out of 0 total leakage reports this month

No leakage points available

Run the leakage seed data or submit a new leakage report to populate the dashboard.

Total Reports

0

Not Fixed

0

Temporal Fix

0

Fixed

0

Leakage Resolution Overview

Resolution Rate

0.0%

Fixed

0

None

0

Current Month

September 2026

Simple Pie Chart

September 2026
Not Fixed
0
Temporal Fix
0
Fixed
0
None
0

Materials Catalog

Reusable material master list linked to leakage reports through leakage_report_material.

6 materials
Material
Gate Valve
Cost
78,000.00
Used In Leakages
0
Created
Sep 14, 2026 15:00
Material
Joint Adhesive
Cost
9,500.00
Used In Leakages
0
Created
Sep 14, 2026 15:00
Material
Pipe Clamp
Cost
12,000.00
Used In Leakages
0
Created
Sep 14, 2026 15:00
Material
PVC Coupling
Cost
8,500.00
Used In Leakages
0
Created
Sep 14, 2026 15:00
Material
PVC Pipe 50mm
Cost
45,000.00
Used In Leakages
0
Created
Sep 14, 2026 15:00
Material
Rubber Seal
Cost
3,000.00
Used In Leakages
0
Created
Sep 14, 2026 15:00
© Duwasa Leakage Management System - By DUWASA ICT
Theme Settings
Color Scheme
Light
Dark
Layout Mode
Fluid
Detached
Topbar Color
Light
Dark
Gradient
Menu Color
Light
Dark
Brand
Sidebar Size
Default
Compact
Condensed
Hover View
Full Layout
Hidden
Container Width
Layout Position